Free Essay SamplesAbout UsContact Us Order Now

System Implementation Phase Revised

0 / 5. 0

Words: 275

Pages: 1

89

System Implementation Phase
Name
Institutional Affiliation
System Implementation Phase
Site Preparation
For efficient site preparation for servers and printers, a consideration on-site preparation should ensure aisle space and airflow. Studies have recognized that the site should provide the needed room at the back and front of racks and cabinets so that the servers and printers will have unobstructed servicing and unobstructed passage of workers (Ali & Miller, 2017). Since the site will cover other hardware installations, the physical location requires consideration of airflow to ensure there are exhaust and intake of air, especially to the location’s data center. Both the aisle space and airflow will provide cooling of the printers, servers, and other hardware.
User Preparation
Site audit: site users should be engaged in a succinct review of the site that includes assessment of the data center environment, being at abreast with the printers, servers, and other hardware.
System installation specifications and use: users should be able to map out the functionalities and systems’ installation requirements, verify that tasks on the servers and other hardware are configured and that these tasks can be executed effectively.
Training on ways in which site redundancy, flexibility, and expandability can extend user working experience and quick response to mission-critical software and or hardware.
Installing hardware and software
The first step is the determination of the software and hardware configurations obtained from sales representatives.

Wait! System Implementation Phase Revised paper is just an example!

The second step is the determination of maximum hardware/software configurations. For instance, understanding maximum data configuration is essential in knowing to cool, planning for power, electrical circuits, and backup power plans. The third step is the process of installation which will be as follows:
Installation of external and internal components
Power up and run tests for all hardware and or software components
Where necessary, partition operating system to accommodate the needed software
Install and configure the needed software
Installations of the needed software patches
References
Ali, M., & Miller, L. (2017). ERP system implementation in large enterprises–a systematic literature review. Journal of Enterprise Information Management, 30(4), 666-692.

Get quality help now

Ashley Miller

5.0 (201 reviews)

Recent reviews about this Writer

Thank you for your services, they are really helpful! I was ready to give up my term paper because I just haven’t any idea what to write about. I’ve found a couple of ideas here and finished my piece without hurdles.

View profile

Related Essays

Websites for Sociologists

Pages: 1

(275 words)

CQI.revised

Pages: 1

(275 words)

FR U1IP

Pages: 1

(275 words)

Primary approach of the article

Pages: 1

(550 words)

see belo

Pages: 1

(275 words)

Career Paths

Pages: 1

(550 words)

MCAA U4DB response 1 and 2

Pages: 1

(275 words)

MCAA U4DB Initial

Pages: 1

(275 words)